Tag Archives: lockdown

Missing Pieces

14 Sep

DIY project number four has been coming along at a good pace until a slight hiccup several days ago. Or should I say, a big stumbling block? I discovered that some pieces were missing! Uh oh.

Unfortunately, I discovered two important elements missing only now after working on the set for some time. I guess I couldn’t have found out earlier as the focus was on the bigger and individual pieces. These two missing pieces are essential for the itty bitty decorations.

Missing item #1: labeled K10, it is a bunch of plastic leaves for the flowers. I sat on this problem for several days, wondering how to overcome this. In the end, I bought a pack of leaves and improvised from there, cutting them down to fit. And they did, thank goodness.

Missing item #2: labeled K09, it is an 80cm length of wire for making the stem/stalk of the plants/flowers. I took some garden wires from hubby’s supplies, and trimmed them down to make the plants and flowers. And they came out good. Phew!

Sometimes we need to improvise and DIY a DIY project. I hope no more discoveries of missing pieces from here onwards.

Knock! Knock! Let Me In

11 Sep

It’s been a while since my preoccupation with the caterpillars in our garden. Ever since the various MCO phases, I’ve hardly ventured out to the garden because I’ve been busy cooking, carving and crafting inside the house.

Knock! Knock! Let me in… 😅

So it was a surprise when we discovered one adventurous caterpillar on our front door! Is it trying to come in? Hahaha… It amazingly made the long trek from the lime tree in front of the house, a good ten feet away, and four feet up the door. How? Why? I don’t know.

We also spotted another one on the same lime tree. While it’s nice to have them around, just to observe their growth and transformation, they’re actually detrimental to the plants.

Nonetheless, we didn’t have the heart to harm our little adventurous friend, so hubby relocated him to the garden. It certainly looked happy chomping away on the leaves when I checked on it the next day.

Relocated to the garden

A New Tray

8 Sep

The mood for online shopping struck a few weeks ago. And I purchased a silicon baking tray, not for me obviously but for hubby. He has been baking a lot during the MCO, so we thought it’d be fun to vary the bread shapes and sizes.

Now, this is our first silicon tray for baking, and it took hubby a couple of bakes to get it right as far as the temperature and timing control are concerned. On the first attempt, I was left in charged to watch the loaves in the oven because he had to leave for the office.

Obviously I cannot bake! 😅

And the mini loaves, under my watch, came out a little burnt! Oops. I had followed the temperature and timing accordingly though…

Second attempt using a wheat bread recipe

So hubby had to make some adjustments. On his second and third attempts, using a wheat bread recipe, the loaves turned out okay. And by the fourth attempt, the mini loaves turned out lovely. All these attempts, I wasn’t roped in to help, thank goodness.

A tad too little (dough) that resulted in skinny minis?

We love the new tray and the breads.

Lovely mini loaves by the fourth attempt

Good Progress

7 Sep
The makings of DIY project #4

There’s much progress with DIY project #4. Most of the big pieces are done up. However, I face some unexpected predicaments.

The two cross beams are not quite aligned and the main pillar cannot touch the roof! Yikes. I have to modify things a little to resolve these issues so that the whole set does not fall apart.

The coffee machine

Other than these structural challenges, the little pieces are coming along at a good pace. I think this set can be completed quickly. If this is the case, I should buy another set, ready to be worked on when this set is completed.

Endings and Beginnings

4 Sep
So detailed when lighted up!

I have finally completed the DIY project #3. It now sits proudly with the other two completed projects at the dining table. Even my Gnomes are enjoying the fruits of my labor, chilling in all the rooms! Heheh…

Four Gnomes are just chillin’

And so, with an end, another begins – the fourth DIY project which is another cafe. And it’s about the same size as the earlier cafe but minimal plants.

Here we go with Project #4!

I find this latest set is even more challenging because the instructions are rather small in font size, and all in Chinese unlike the previous sets. And I for one, cannot read Chinese!

So I had to download the Google Translate app and use if the pictorial steps with tiny Chinese characters are not clear. Thank goodness for technology that is put to good use here.

Well, I’m in no hurry to finish this set and will work on it at a comfortable pace. The best part, no fabrics to deal with! Yay.

A Very Short Trip

1 Sep

Over the weekend, it was our first time doing a really short anniversary trip. Just two days and a night away, given the circumstances of the pandemic and protocols to contain the spread.

We decided to visit Malacca again after the last trip there to check out the Husky cafe with M2. This trip, sans M2, it was simply a round of golf at A’Formosa Golf Resort, food and playing tourist at Jonker Walk.

The front of Aava Hotel. The back entrance faces the riverfront.
The lobby, breakfast room and waiting area. Room was big and comfy.

We stayed at Aava Hotel which was very strategic and within walking distance to the attractions. On Saturday evening, after golf and checking in, we explored the street market on Jonker Walk before and after dinner. People were all masked up and it wasn’t too crowded.

Pre-dinner was Cendol and Satay
Lovely anniversary tapas dinner

The next day, we even had time to do a morning walkabout again after breakfast. To our delight, we stumbled upon a morning antique market. Not as big as the night attractions, it was very interesting nonetheless. Some of the items on displays brought back memories of things both of us had seen or used when we were young. Lovely.

Colorful rickshaws on the road!

By eleven, we checked out and bade Malacca goodbye, to head for lunch in Seremban. Unfortunately, the famous Beef Noodle at the market was too long a queue, so we opted for something else instead. Oh well, next time…

Clay pot Loh Shi Fun

Next stop was Seremban International Golf Club (SIGC) for an afternoon round of golf before going home. It was windy, the fairways were hard and the greens were horrid to putt. Then it rained. Haish… we had to wait out the rain for about 20 minutes before we could resume our remaining seven holes.

All in all, the trip was short, sweet and very enjoyable. Sometimes it doesn’t have to be far and foreign or exotic but doing what we enjoy most together is best.

DIY Project #3: Final Touches

28 Aug

The tail-end of DIY Project #3 has been very systematic and easy. I guess working on the little pieces ahead and allowing them to dry with time helped. Then once the wiring was done up for the ground floor, and the first floor installed, it was a breeze from that point.

Lights in place for the ground floor

The last two hurdles were the bed and room chair but I was patient. In between my golf days and cooking, I got these two done up without any procrastination.

The final touch now is drilling a new hole for the wiring in the living room. The original hole is inaccurate when the side table that has the wire for the lamp, is placed over the hole. It does not align to the living room sofa and table that are already in place.

Old hole (red circle) and new hole (purple circle) for the wires

Well, when the drilling is eventually attended to, I can proudly say this set is truly complete. Good job!

Such a livable little abode!

Down the Homestretch

25 Aug
The almost complete 2-story

I’m down the homestretch for the third DIY project now that most of the pieces are in place!

The sofa’s done with the pillows in place, the first floor is up, and the stairs as well. Even the bathroom is done. This time I managed to get the shower door installed, unlike the previous set whereby the door did not align at all, so I left it out.

A very detailed bathroom

However, I still have the bed and a chair to work on before the whole set is complete. And ugh, I have fabrics to deal with. I hope I won’t get derailed.

New Project Awaits

24 Aug

When I completed the second DIY project, the 3-story bungalow, I felt a sense of accomplishment. I was very motivated by my patience and skills, so much so, I purchased another set to work on! The latest set, also another cafe arrived last week.

My latest DIY to work on

This latest online-purchased set appealed to me because it had minimal fabrics. And its footprint is not very big to clutter the display space when completed.

The parts to another cafe

However, excited as I am, I am not starting on it just yet as I am still working on the 2-story set. Progress has been slow because of the sofa and pillows, and that unexpected bedside table problem. Luckily I managed to resolve that, and I hope to finish this set soonest possible so that I can start on the new one in queue.

Tiny Pillows Challenge

21 Aug
Deft hands are required to handle these!

Working on the 2-story set that I took over has not been easy. There are so many pillows to make compared to the previous set. Being so tiny, the pillows are harder to hold and glue, and slows down my progress.

And as if this is not enough a deterrent, I discovered two pieces are missing to make the bedside table! I searched high and low, thinking they could have fallen out but nope, the two pieces were not included at all.

For several days, the problem was on my mind. How do I fix this? One night, the solution presented itself as I spotted a pack of ice cream sticks in my art taboret. It might just work because the sticks are of the same thickness.

So I cut the sizes that were required, and I even had orange acrylic paint to paint up the panels. And before I knew it, the bedside table was completed. Phew. With the problem resolved, I hope no further issues as I continue on.

DIY a DIY project!