Down the Homestretch

25 Aug
The almost complete 2-story

I’m down the homestretch for the third DIY project now that most of the pieces are in place!

The sofa’s done with the pillows in place, the first floor is up, and the stairs as well. Even the bathroom is done. This time I managed to get the shower door installed, unlike the previous set whereby the door did not align at all, so I left it out.

A very detailed bathroom

However, I still have the bed and a chair to work on before the whole set is complete. And ugh, I have fabrics to deal with. I hope I won’t get derailed.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: